Monthly Charge
Half Cabinet
5.0 kVA Maximum
Provisioning
Go-Live Timeframe: 3 business day(s)
Expedited Timeframe: 2 business day(s)
Minimum Term: 12 month(s)
Ready To Order?
Sign Up for Account Log In To Continue
Cabinet Configuration
Cab Space Enclosed Height (U) Units Depth Width Max kVA Extra Prov Days Setup Fee Monthly Charge
Half Yes 24 Inches 30 19 5.0 0
Power Configuration
AC/DC Volts Phase Type Amps per Circuit Usable Amps Usable kW Extra Prov Days Rate kW/h Setup Fee Monthly Charge
AC +120 Single Primary Plus Secondary 20 16 1.92 0
Cross Connect Configuration
Type Connector (Fiber Only) Mode (Fiber Only) Number of Pairs Extra Prov Days Setup Fee Monthly Charge
Copper - - - 0
Fiber SC SM 1 0
Discounts and Fees
Discount Setup Fee Monthly Charge
Two-Year Term
Up-front Payment
Fee Setup Fee Monthly Charge
Expedited Provisioning
Sub 1-year Term
On-Net Transit Providers
  • Reliance Globalcom (Archived)
Amenities
  • Complimentary Carts with Keyboard and Monitor
  • Complimentary Phone Service
  • Complimentary Wifi
  • Direct Access to Data Center Personnel
  • Location/Proximity to Public Transportation
Features
  • 24/7 CTV
  • Card Reader
  • Diesel Refueling Contracts
  • Fire Protection
  • Fire Suppression
  • NOC
  • Online Ticketing System
  • Real-time Traffic Reports
Certifications
  • SAS70 Type II