Monthly Charge
Full Cabinet
20.0 kVA Maximum
Provisioning
Go-Live Timeframe: 20 business day(s)
Expedited Timeframe: 5 business day(s)
Minimum Term: 12 month(s)
Ready To Order?
Sign Up for Account Log In To Continue
Cabinet Configuration
Cab Space Enclosed Height (U) Units Depth Width Max kVA Extra Prov Days Setup Fee Monthly Charge
Full Yes 42 CentiMeters 100 60 20.0 0
Power Configuration
AC/DC Volts Phase Type Amps per Circuit Usable Amps Usable kW Extra Prov Days Rate kW/h Setup Fee Monthly Charge
AC +230 Single Primary Plus Secondary 32 26 6.0 0
AC +230 Single Primary Plus Secondary 32 26 4.0 0
Cross Connect Configuration
Type Connector (Fiber Only) Mode (Fiber Only) Number of Pairs Extra Prov Days Setup Fee Monthly Charge
Copper - - - 0
Fiber SC SM 1 0
Fiber LC SM 1 0
Fiber SC MM 1 0
Fiber LC MM 1 0
Fiber SC SM 6 0
Discounts and Fees
Discount Setup Fee Monthly Charge
Two-Year Term
Up-front Payment
Fee Setup Fee Monthly Charge
Expedited Provisioning
Sub 1-year Term
On-Net Transit Providers
  • TeliaSonera
Peering Exchanges
  • Decix
Amenities
  • Direct Access to Data Center Personnel
  • Location/Proximity to Public Transportation
  • Web Based Customer Portal
Features
  • Fire Suppression
  • Power SLA
  • 24/7 CTV
  • 24/7 Onsite Technical Personnel
  • Caged Space
  • Card Reader
  • Climate Control with Full Particle Filtering
  • Cooling Tower
  • Diesel Refueling Contracts
  • Fire Protection
  • Man Trap
  • Motion Detector
  • N+1 Backup Power
  • Network SLA
  • NOC
  • Online Ticketing System
  • Owned and Operated
  • Private Suite
  • Raised Floor
  • Real-time Traffic Reports
  • Roof Rights
  • Staging Environment
  • Unescorted Access with Authorization
Certifications
  • German Telecommunications Act (TKG)